AI-Powered
Plan Intelligence
Upload your plans. Get an expert-grade review in minutes, not days.
Trusted by construction professionals nationwide
Plan Review, Reimagined
Everything your team needs to review construction plans with confidence.
Expert Plan Review
AI reviews every sheet with trade-specific expertise — structural, mechanical, electrical, plumbing, and more.
Cross-Discipline Conflicts
Catch coordination issues between trades before they become expensive problems in the field.
Professional Reports
Export detailed PDF reports for your team — clear findings, organized by trade and severity.
Built for Every Role on the Project
No matter where you sit on the team, SheetIntel gives you an edge.
Developers & Owners
Walk into your next architect meeting with full plan intelligence. Know what questions to ask before they hand you the bill.
Architects
QA check before you deliver — catch coordination issues first. Protect your reputation with every submittal.
Contractors
Know exactly what you're bidding before you price it. Surface scope gaps, missing details, and coordination risks.
Engineers
Cross-discipline conflict detection across all trades. Verify your design intent carries through the full set.
How It Works
Three simple steps from upload to insight.
Upload
Drag and drop your construction plans. We accept PDF files up to any plan set size.
Review
AI analyzes every sheet — identifying issues, conflicts, and missing details across all trades.
Export
Download a professional PDF report organized by trade, ready to share with your team.
What SheetIntel Found in a Commercial Coffee Shop Buildout
50-sheet Dunkin' Donuts tenant buildout. 30 RFIs generated. Reviewed in minutes. Here's what an AI construction plan review actually catches — trade by trade.
Electrical — 7 RFIs, 4 High-Priority
MEP conflict detection and scope gap identification in electrical plans
-
HIGH
Missing Sheet EG — Referenced on Sheet E8 for critical service entrance and CT cabinet requirements. Without this sheet, utility coordination and permit approval are blocked. Estimated delay cost: $8,000–$20,000.
-
HIGH
Conflicting Cable Specs on Same Sheet — General Note F on Sheet E3 requires CAT-5e, but the Equipment Schedule on the same sheet specifies CAT-6 for the Site Controller. A sub who follows one note and not the other installs the wrong cable. Rework cost: $2,000–$5,000.
-
HIGH
Cord & Plug Responsibility Matrix Unclear — Sheet E7 splits responsibility for cords and caps between EC, GC, and equipment vendors with no master matrix. Undefined scope leads to finger-pointing during commissioning.
-
MED
Possible ADA Receptacle Height Violation — Mounting heights of 1'-2" AFF on Sheet E2A may fall below the 15" ADA minimum. Catch before rough-in to avoid required patching and rework.
Plumbing — Pipe Sizing Error Caught Before Rough-In
Automated scope gap identification in plumbing plans saved a costly rough-in mistake
-
HIGH
4× Oversized Supply Pipe on Fixture Schedule — Sheet P5 lists 2" CW/HW supply for individual lavatory and water closet fixtures. Standard sizing is 1/2"–3/4". If built as drawn, the plumber installs 4× oversized pipe, wastes material, and fails inspection. Catching this before rough-in saves an estimated $4,000–$8,000 in demo and re-rough.
-
HIGH
Grease Interceptor Condition Undefined — Plans call for reuse of an existing 1,000-gallon pre-cast interceptor but provide no inspection protocol or contingency if it fails condition review. Health department sign-off at risk.
-
HIGH
Fixture Quantities Missing From Schedule — P5 fixture schedule lists types but no quantities for lavatories, water closets, or hand sinks. Estimators cannot price rough-in without this data.
Mechanical — Equipment Label Conflict Could Order Wrong Units
Cross-discipline MEP conflict detection flagged a labeling inconsistency before procurement
-
HIGH
RTU vs. AHU Labeling Conflict — Sheet M2 references RTU-2 and RTU-3 in the Air Balance Schedule, but the floor plan and M3 equipment schedules list AHU-1, AHU-2, CU-1, and CU-2. Ordering rooftop units when split systems are specified — or vice versa — is a $15,000–$30,000 procurement mistake.
-
HIGH
Two Exhaust Fans Missing From Equipment Schedule — HEF-2 and HEF-3 are shown on Sheet M2 but absent from the Fan Schedule on M3. No capacity, no electrical requirements, no spec. Cannot price or permit.
-
MED
Duct Smoke Detector Locations Missing — Smoke detector shown in legend but no locations plotted on the plan. Fire marshal sign-off and occupancy permit at risk if not resolved before rough-in.
Sample RFI Output — Master Log
30 RFIs generated from 50-sheet setRFI-ELE-001
Missing Sheet EG — Critical Service Entrance Documentation
Source: Sheet E8 — CT cabinet and meter requirements unresolved
RFI-PLU-003
Verify supply pipe sizes — 2" CW/HW listed for individual fixtures is 4× oversized
Source: Sheet P5 — Standard sizing is 1/2"–3/4"; confirm before rough-in
RFI-MEC-001
Equipment label discrepancy — RTU-2/RTU-3 vs. AHU-1/AHU-2 across sheets
Source: Sheets M2, M3 — Confirm system type before procurement
RFI-ELE-003
Conflicting cable spec — CAT-5e in General Notes vs. CAT-6 in Equipment Schedule
Source: Sheet E3 — Both specs on same sheet; electrician will install wrong cable
RFI-GC-001
Conflicting revision dates — 07/11/2025 vs. 03/04/26 on demolition and interior sheets
Source: Sheets D1, ID7 — Confirm which revision is current before issuing for construction
This is what automated AI construction plan review looks like on a real commercial set. 30 RFIs. 50 sheets. Minutes, not days.
Run Your Plans — First Review FreeSimple, Transparent Pricing
Start free. Scale when you're ready.
Free
Try it out — no credit card required.
- Up to 10 pages per review
- Basic plan analysis
- PDF export
- 1 review included
Per Set
Less than 30 min of estimator time. One missed RFI costs $5K–$50K.
- Unlimited pages per review
- Full trade-specific analysis
- Cross-discipline conflict detection
- Professional PDF reports
Pro
5 sets included — $10 each after. Less than the cost of one field change order per month.
- Everything in Per Set
- 5 plan sets included monthly
- Priority processing
- Review history & comparisons
- Dedicated support
Ready to review your plans?
Upload your first set free. No credit card, no commitment — just better plan intelligence.